hh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Implementation of Lean Tools in the Garments Industry to Improve Productivity
Halmstad University.
2021 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

A few years back, almost every garment manufacturer industry started implementing “lean Manufacturing.” Garments manufacturing is one of the oldest manufacturing systems, compromising a higher number of critical operations. The main performance indicators in the garment industry are the lead time, production rate, more wastage, and labor intensity. To remain competitive in the global market, the most important task for garments manufacturers is to reduce lead time and waste, which is also essential for productivity and long-term stable development. A headlong rush to reduce lead time and waste by turning into lean and responsive manufacturing has created an urgency for researchers and practitioners to apply new tools and techniques for discovering wastages. This thesis focuses on the application of value stream mapping in the garments industry to implement lean manufacturing system. Value stream mapping (VSM) helps visualize Material Flow and Information Flows of all components, cycle times, and utilization of resources. VSM is a proven lean technique in identifying and eliminating wastes in accommodation with similar or identical product routings.

The research approach adopted in this thesis is abductive. Qualitative has been collected by the structured and semi-structured interviews. A single case observation has been made to use VSM as a lean tool to achieve productivity improvement at a selected garment company. Both current and future state mapping of cutting section and sewing line scenarios are discussed using value stream concepts. This was analyzed along with the process lead time as standard minute value (SMV) calculation and two gaps as productive time and non-productive.

 Finally, gain in productivity (increase output pcs, less worker, less working hours), increased productive time, and reduce non-productive time was calculated.

Place, publisher, year, edition, pages
2021. , p. 115
Keywords [en]
productivity, lean tools, value stream mapping, line balancing, garments.
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hh:diva-45733OAI: oai:DiVA.org:hh-45733DiVA, id: diva2:1603132
Educational program
Master's Programme in Industrial Management and Innovation, 120 credits
Supervisors
Examiners
Available from: 2021-10-15 Created: 2021-10-14 Last updated: 2025-10-01Bibliographically approved

Open Access in DiVA

fulltext(19416 kB)5540 downloads
File information
File name FULLTEXT02.pdfFile size 19416 kBChecksum SHA-512
e1b0e9114199dd43d971a65e7985a7f455cd9c57442314c0ef3c3aa8f828c0b717e3094bad61b2473782db890e6eb8ed280d2083b1567305a1bf0dbe3d373441
Type fulltextMimetype application/pdf

By organisation
Halmstad University
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 5553 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 2875 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf