hh.sePublications
Change search
Refine search result
1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Rows per page
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sort
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
  • Standard (Relevance)
  • Author A-Ö
  • Author Ö-A
  • Title A-Ö
  • Title Ö-A
  • Publication type A-Ö
  • Publication type Ö-A
  • Issued (Oldest first)
  • Issued (Newest first)
  • Created (Oldest first)
  • Created (Newest first)
  • Last updated (Oldest first)
  • Last updated (Newest first)
  • Disputation date (earliest first)
  • Disputation date (latest first)
Select
The maximal number of hits you can export is 250. When you want to export more records please use the Create feeds function.
  • 1.
    Persson, Philip
    et al.
    Halmstad University, School of Business, Engineering and Science.
    Andersson, Ludvig
    Halmstad University, School of Business, Engineering and Science.
    Taktningsutrustning till Ljungbymaskin2017Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
    Abstract [en]

    This bachelor thesis was made on behalf from the wheel load maker Ljungby Maskin AB. Ljungby Maskin is right now in an expansive stage with a development of the welding workshop and the paint shop. In relationship to this they are also changing from station assembly to production line. Because of the progress they have needs of some type of transport method. The first step of the project was to decide what method that should be used. Rune Andersson, one of the supervisors in the project was at first into using air caster/air bearings to transport the production. However after some research the result was that air caster wasn’t the best method to use.  To make this conclusion a visit at Atlas Copco was made to see their production lines and a discussion with the production developer at AC was made. After the method was decided, the design of the fixtures could be made. The method to make the design was principle and primary design by Fredy Olsson. The output from this gave in total 12 different constructions. Pugh-matrix was made at the different constructions to be sure which one that should be used.  Complete CAD-models were made for the constructions that got the highest mark. Through a product draft it was determined which details that should been bought and which should be self-designed. Complete detail constructions were made at these parts. To ensure the strength of the parts, FEM-analysis was made in CATIA V5. The conclusion was that the project will be a good support in the development of the new assembly workshop at Ljungby Maskin AB and that it will contribute to a smaller storage and increase the production. 

1 - 1 of 1
CiteExportLink to result list
Permanent link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf