hh.sePublikasjoner
Endre søk
Begrens søket
1 - 1 of 1
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Treff pr side
  • 5
  • 10
  • 20
  • 50
  • 100
  • 250
Sortering
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
  • Standard (Relevans)
  • Forfatter A-Ø
  • Forfatter Ø-A
  • Tittel A-Ø
  • Tittel Ø-A
  • Type publikasjon A-Ø
  • Type publikasjon Ø-A
  • Eldste først
  • Nyeste først
  • Skapad (Eldste først)
  • Skapad (Nyeste først)
  • Senast uppdaterad (Eldste først)
  • Senast uppdaterad (Nyeste først)
  • Disputationsdatum (tidligste først)
  • Disputationsdatum (siste først)
Merk
Maxantalet träffar du kan exportera från sökgränssnittet är 250. Vid större uttag använd dig av utsökningar.
  • 1.
    Hernvall, Hannes
    Högskolan i Halmstad, Sektionen för ekonomi och teknik (SET).
    Kvalitetssäkring:En analys av egenkontroll2014Independent thesis Basic level (university diploma), 10 poäng / 15 hpOppgave
    Abstract [en]

    A degree thesis about quality control and assurance in construction. Made in cooperation with Wästbygg. An analysis was made of the self-monitoring control that is conducted during the construction. The data was collected from interviews from personnel employed by Wäsbygg as either work-leader, project-manager or quality- and environmental-coordinator. During the study there was also a review of the literature in the subject. From the data collected it was found that lack of commitment and poor attitude about the procedure were some of the main reasons why it doesn't work.

    To improve the self-monitoring control during construction is it necessary to execute it more consistently. Have clearer definitions for what self-monitoring control to make it easier for workers to conduct it. The workers also needs extra training and education in the subject to preform it better. The management on site does also need to participate more to show that it's a important procedure.

    Fulltekst (pdf)
    fulltext
1 - 1 of 1
RefereraExporteraLink til resultatlisten
Permanent link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf