hh.se
Publications
Planned maintenance
A system upgrade is planned for 10/12-2024, at 12:00-13:00. During this time DiVA will be unavailable.
Please wait ...
Simple search
Advanced search -
Research publications
Advanced search -
Student theses
Statistics
English
Svenska
Norsk
Jump to content
Change search
Search
Search
Only documents with full text in DiVA
Cite
Export
BibTex
CSL-JSON
CSV 1
CSV 2
CSV 3
CSV 4
CSV 5
CSV all metadata
CSV all metadata version 2
RIS
Mods
MARC-XML
ETDMS
Link to record
Permanent link
https://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-13064
Direct link
http://hh.diva-portal.org/smash/record.jsf?pid=diva2:368233
Cite
Citation style
apa
ieee
modern-language-association-8th-edition
vancouver
Other style
apa
ieee
modern-language-association-8th-edition
vancouver
Other style
More styles
Language
de-DE
en-GB
en-US
fi-FI
nn-NO
nn-NB
sv-SE
Other locale
de-DE
en-GB
en-US
fi-FI
nn-NO
nn-NB
sv-SE
Other locale
More languages
Output format
html
text
asciidoc
rtf
html
text
asciidoc
rtf
Create
Close
Samband mellan pressade byggtider och olycksfall på arbetsplatsen.
Saukkonen, Désirée
Halmstad University, School of Business and Engineering (SET).
Zetterman, Martin
Halmstad University, School of Business and Engineering (SET).
2005 (Swedish)
Independent thesis Basic level (degree of Bachelor)
Student thesis
Abstract [sv]
This report is written about the problems with fast-track construction times. The writers have investigated if there are any connections between accidents on site and fast-track construction times. The problem is well debated and it has been shown very complicated. This report includes background, definitions, regulations and laws, interviews and conclusions, about the subject. The result of the report is that it is impossible to prove if there are any connections between fast-track construction times and accidents on the site. There are though many things that point that so is the case. The interviews and other investigations show clearly that the industry relates fast-track constructions times with worse safety on the construction site.
Place, publisher, year, edition, pages
2005.
Identifiers
URN:
urn:nbn:se:hh:diva-13064
Local ID: U12136
OAI: oai:DiVA.org:hh-13064
DiVA, id:
diva2:368233
Uppsok
Technology
Note
Denna uppsats kan beställas från arkivet / This paper can be ordered from the archive. Kontakta / Contact: arkivet@hh.se
Available from:
2010-11-09
Created:
2010-11-09
Bibliographically approved
Open Access in DiVA
No full text in DiVA
By organisation
School of Business and Engineering (SET)
Search outside of DiVA
Google
Google Scholar
urn-nbn
Altmetric score
urn-nbn
Total: 82 hits
Cite
Export
BibTex
CSL-JSON
CSV 1
CSV 2
CSV 3
CSV 4
CSV 5
CSV all metadata
CSV all metadata version 2
RIS
Mods
MARC-XML
ETDMS
Link to record
Permanent link
https://urn.kb.se/resolve?urn=urn:nbn:se:hh:diva-13064
Direct link
http://hh.diva-portal.org/smash/record.jsf?pid=diva2:368233
Cite
Citation style
apa
ieee
modern-language-association-8th-edition
vancouver
Other style
apa
ieee
modern-language-association-8th-edition
vancouver
Other style
More styles
Language
de-DE
en-GB
en-US
fi-FI
nn-NO
nn-NB
sv-SE
Other locale
de-DE
en-GB
en-US
fi-FI
nn-NO
nn-NB
sv-SE
Other locale
More languages
Output format
html
text
asciidoc
rtf
html
text
asciidoc
rtf
Create
Close
v. 2.44.0
|
WCAG
|
Halmstad University Library
|
Info for students
|
Info for researchers
|
Log in
DiVA
Logotyp