hh.sePublications
System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Concrete casted on site / prefabricated connrete: studie of produktion
Halmstad University, School of Business and Engineering (SET).
Halmstad University, School of Business and Engineering (SET).
1996 (Swedish)Independent thesis Basic level (degree of Bachelor)Student thesis
Abstract [sv]
A casted framework on site, or a combination of cast concrete walls and prefabricated system onm joists, is in most cases cheaper to produce than a prefabricated framework. A cast concrete building on site, will however take longer time to produce and dry out.
Place, publisher, year, edition, pages
1996.
Keywords [sv]
concrete
Identifiers
URN: urn:nbn:se:hh:diva-7157Local ID: U1026OAI: oai:DiVA.org:hh-7157DiVA, id: diva2:362202
Uppsok
Technology
Note
Denna uppsats kan beställas från arkivet / This paper can be ordered from the archive. Kontakta / Contact: arkivet@hh.seAvailable from: 2010-11-09 Created: 2010-11-09Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
School of Business and Engineering (SET)

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 52 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf