hh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Ombyggnad av flerbostadshus: Hur påverkas hyresgästerna av  en ombyggnad
Halmstad University, School of Business and Engineering (SET).
2010 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

During the years 1950-75 was the construction of building apartments in high speed. A rapidly growing reconstruction requirement is the consequence of the rapid construction speed in these years. The technical lifetime of the different parts of the buildings is about to end and the needs for reconstruction is huge. One of Sweden's national environmental objectives is to reduce the urge of energy in buildings. This calls for radical measures to implement energy efficiency of existing assistance particularly in the assistance that is now facing reconstruction. Most of the apartments that are in need of reconstruction is leased and residents. No matter what kind of measures as deems most appropriate in a reconstruction project, it brings the different types of disturbances that affect the residents. The major disturbances that are perceived as most disturbing of the tenants are dust, noise and difficult accessibility. Temporary electricity, water and ventilation failure are other types of disturbances that often occur at a reconstruction project. In this thesis, most of the disturbances are identified and also some approaches to achieve the best possible way to reduce them. A reconstruction project in Karlskrona was visited, where participants as the property owner, contractor, professional men and tenants were interviewed. It is important to both the property owner and the contractor to ensure the reduction of disturbances as much as possible. It is obviously not easy to eliminate some of the disturbances but through good planning, sufficient information and to set requirements to the contractor in the form of legal framework for procurement and restrictions which should be register in the AF part (General Regulations), the effect of disturbances will successfully being reduced. The key to a successful reconstruction project with minimal disturbances to residents is primarily depended on the property owner's ambition, empathy and commitment to their tenants.

 

Place, publisher, year, edition, pages
2010. , 44 p.
Keyword [sv]
ombyggnad, flerbostadshus, påverka, hyresgäster, entreprenör, störningar
National Category
Building Technologies
Identifiers
URN: urn:nbn:se:hh:diva-5188OAI: oai:DiVA.org:hh-5188DiVA: diva2:329550
Uppsok
Technology
Supervisors
Examiners
Available from: 2010-07-12 Created: 2010-07-12 Last updated: 2010-07-12Bibliographically approved

Open Access in DiVA

fulltext(273 kB)617 downloads
File information
File name FULLTEXT01.pdfFile size 273 kBChecksum SHA-512
c97473f758f78ae76092ded63af8a33a3b6b3941193213b49b8dfbdd677bdd1ebad91c064008ddc1d49bf690245d865cc60914ac3f1f5111f44ae2a6cf0135b2
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
najafi, amin
By organisation
School of Business and Engineering (SET)
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 617 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 256 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf