hh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Nyutveckling av sjunkspärr
Halmstad University, School of Business and Engineering (SET), Mechanical Engineering and Industrial Design (MTEK).
Halmstad University, School of Business and Engineering (SET), Mechanical Engineering and Industrial Design (MTEK).
2010 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

We got in contact with Marco AB, who we’ve had contact with before concerning earlier projects, to find out if they were interested in arranging a larger project for our last class (Examensarbete 15hp). They were very positive to this proposition, and soon they offered us a project regarding reconstruction of their current mechanical device that absorbs all the force from the lift itself when it is at a predefined level (sv. sjunkspärr). The current solution does fulfill the requirements that are given, however it is not a solution that gives a high level of satisfactory. It is complicated, both to manufacture and assemble, it is not recyclable due to the hydraulic system and in addition it has retardation issues. But most of all, it is expensive. That may raise the question; how come Marco is still using the current solution? The device is an accessory for the lift tables that Marco produces and sells, not a standard solution. They produce about 100-150 of them every year, and therefore is a small part of their total income. This in addition to the solution being bought from a consultant, they merely tested the product and then added it to the assortment. The project ended up in a solution none of us could have foreseen, neither by function nor visualization.

Place, publisher, year, edition, pages
2010. , 101 p.
Keyword [sv]
sjunkspärr, utveckling, konstruktion, lyftbord, mekanisk, solenoid
Identifiers
URN: urn:nbn:se:hh:diva-4946OAI: oai:DiVA.org:hh-4946DiVA: diva2:326131
Presentation
2010-05-26, O124, Halmstad Högskola, Halmstad, 09:00 (Swedish)
Uppsok
Technology
Supervisors
Examiners
Available from: 2010-06-22 Created: 2010-06-21 Last updated: 2010-06-22Bibliographically approved

Open Access in DiVA

fulltext(11079 kB)410 downloads
File information
File name FULLTEXT01.pdfFile size 11079 kBChecksum SHA-512
40ef43a958114846462c6229781393b979d5f762864c2937c2c5822f3c30f360277c0bc89248a4a2c9ddec57c325ca28262ecb4f6c1aed6bb1db6b4b00f8b041
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Hansson, TorbjörnLuckmann, Christian
By organisation
Mechanical Engineering and Industrial Design (MTEK)

Search outside of DiVA

GoogleGoogle Scholar
Total: 410 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 211 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf