hh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Utvärdering av BeWi Byggsystem
Halmstad University, School of Business and Engineering (SET).
Halmstad University, School of Business and Engineering (SET).
2008 (Swedish)Independent thesis Basic level (degree of Bachelor)Student thesis
Abstract [sv]

The construction industries are relatively conservative type of business that takes a long

time to adjust for new methods and embrace new ideas. It dose not matter if the new

method seems to be an improved method as long as it is new and untried. Construction

companies are reluctant to change form a longtime working method to a relatively

unknown method.

The purpose with our report is to perform an evaluation of BeWi construction method.

Our goal are to present the generally opinion about BeWi from the contractors that has

been in contact/worked with the method. We also want to know from the contractor’s

point of view if BeWi and the method measure up to the standards that are presented by

BeWi and if they believe that improvements need to be done.

Our progress up to the final report has consisted of three parts

[1]Field studies

[2]Interviews

[3]Literary studies

We started out with field studies where we took notes and observed all the included

working phases on the construction site when using the BeWi method. Also during our

field studies we ourselves tried working with the method for a more close experience of

the work environment.

As conclusion we can say that BeWi construction method undeniable are an easy- going

and working method that improves the work environment for the construction workers

and also has the potential that can lead to better results.

The system is based on a new kind of method which can lead to complications during the

first times working with it, but the commissioning period relatively short. From an

economical point of view the material costs are higher than a regular wooden foundation

but we believe that you can compensate this in the long run with the low energy costs that

this system gives.

Place, publisher, year, edition, pages
Högskolan i Halmstad/Sektionen för Ekonomi och Teknik (SET) , 2008.
Keywords [sv]
Bewi, Byggsystem, Utvärdering av byggsystem, Byggmetod, metod
Identifiers
URN: urn:nbn:se:hh:diva-1570Local ID: 2082/1951OAI: oai:DiVA.org:hh-1570DiVA, id: diva2:238788
Uppsok
Technology
Available from: 2008-06-25 Created: 2008-06-25 Last updated: 2008-06-25

Open Access in DiVA

fulltext(1345 kB)1160 downloads
File information
File name FULLTEXT01.pdfFile size 1345 kBChecksum MD5
748a2f31e0aa917afaa9968aa9a85a57250ca5d9dcba71fc9a3e26aa5e406a027325217b5ce24eb2e6343c34afb307ae87cc5891af8899c72ce62949bf6874f22ae8e44741ec646f6cec1aa1f38b8e6e
Type fulltextMimetype application/pdf

By organisation
School of Business and Engineering (SET)

Search outside of DiVA

GoogleGoogle Scholar
Total: 1160 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 208 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf