hh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering och utveckling av monteringsutförande i produktion: Från fast till sekventiell montering
Halmstad University, School of Business, Engineering and Science.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Detta examensarbete har gjorts inom produktionssystem och produktionsutveckling och är utfört på SP Maskiner i Ljungby AB (SP Maskiner). SP Maskiner har förutspått en ökad marknadstrend de vill konkurrera i. Detta har gjorts genom att utveckla nuvarande monteringsutförande – fast positionsmontering, då utförandet inte klarar av upprampningen.

Metoden som användes för att åstadkomma resultatet är härled från Bellgran & Säfstens (2005) ramverk för produktionsutveckling.

Arbetet påbörjar genom en initial nulägesanalys vars syfte vara att ge en bredare insyn och känsla för systemet i utveckling. Moment som gjordes var: utvärderingsfrågor, Rapid Plant Assessment, flödesanalyser och CAD ritningar av nuvarande layout. Vidare togs en metodstandard med ledtider fram som uppdelades i tre balanserade stationer vars utfall kontrollerades via simulering.

Simuleringen av metodstandaren påvisar att uppdelning av metodstandard i tre balanserade stationer kan ge 66 % utmatningsökning (jämfört med nuvarande 150 [enheter/år] är det en ökning på 100 [enheter/år]). Resultatet ger företaget ökad konkurrensmöjlighet i den ökade marknadstrend företaget förutspått, därmed blir även samhället mer konkurrenskraftigt. Resultatet påvisar vidare möjligheterna med användning av simulering i produktionsutvecklingsprojekt för undersökning av olika utfall.

Abstract [en]

This thesis has been carried out within the field of production systems and production development and is performed on SP Maskiner i Ljungby AB (SP Maskiner). SP Maskiner has predicted a growing market trend that they want to compete in. This is to be achieved by developing the current assembly process - fixed position assembly, as it fails to cope with the increased demand.

The underlying method used to obtain the results is derived from Bellgran & Säfsten (2005) framework and is adapted to fit this project.

The project begins with a present-situation analysis aimed to give a broader insight and a better sense for the system in development. Activities done were: evaluation questions, Rapid Plant Assessment, flow analyses and CAD drawing of current layout. A standard methodology on how to assemble the product was made, with individual process times of each activity, and divided into three workstations. The possible outcome and benefits of this approach was checked using simulation.

The simulation demonstrates that the three-station divided methodology can increase productivity by about 66 % (an increase of 100 units annually compared to todays rating, 150 [units/year]). The result gives the company extended competitive possibilities and force to stay as a leading competitor in the expected market growth. Furthermore, the result shows the possibilities of simulation in production development projects to analyze possible outcomes of different changes. 

Place, publisher, year, edition, pages
2018. , p. 52
Keywords [sv]
Produktionsutveckling, Ständiga förbättringar, Metodstandard, LEAN
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:hh:diva-36888OAI: oai:DiVA.org:hh-36888DiVA, id: diva2:1212437
External cooperation
SP Maskiner i Ljungby AB
Subject / course
Mechanical Engineering
Educational program
Mechanical Engineering, 180 credits
Supervisors
Examiners
Available from: 2018-06-12 Created: 2018-06-01 Last updated: 2018-06-12Bibliographically approved

Open Access in DiVA

fulltext(3690 kB)24 downloads
File information
File name FULLTEXT03.pdfFile size 3690 kBChecksum SHA-512
c45cfd00936ef41fb1f09580d21c606b83b8e71abb974893e62bd51fb5b7b2a22638c11d041363085285b96b0db9b7ebdbacd457f28ea79884695f1d88ccce00
Type fulltextMimetype application/pdf

By organisation
School of Business, Engineering and Science
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 24 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 51 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf