hh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Wind resource assessment for posibel wind farm development in Dekemhare and Assab, Eritrea
Halmstad University, School of Business, Engineering and Science. (Masters in Renewable Energy Systems)
2018 (English)Independent thesis Advanced level (degree of Master (One Year)), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Recently wind resource assessment studies have become an important research tool to identify the possible wind farm locations.  In this thesis work technical analysis was carried out to determine the wind resource potential of two candidate sites in Eritrea with help of suitable software tools. The first site is located along the Red Sea cost which is well known for its wind resource potential, whereas the second site is located in the central highlands of Eritrea with significant wind resource potential. Detailed wind resource assessment, for one year hourly weather data including wind speed and wind direction, was performed for the two candidate sites using MS Excel and MATLAB. The measured wind data at Assab wind site showed that the mean wind speed and power density was 7.54 m/s and 402.57 W/m2 , whereas the mean wind speed and mean power density from Weibull distribution was 7.51 m/s and 423.71 W/m2 respectively at 80m height. Similarly, the measured mean wind speed and mean power density at Dekemahre wind site was obtained to be 5.498 m/s and 141.45 W/m2, whereas the mean wind speed and mean power density from Weibull distribution was 5.4859m/s and 141.057W/m2 respectively. Based on the analysis results Assab wind site classified as wind class-III and Dekemhare as wind class-I.  Wind farm modeling and Annual Energy Production (AEP) estimation was performed for E-82 & E-53 model turbines from Enercon Company with the help of MATLAB and Windpro software. The analysis revealed that Assab wind farm was an ideal site for wind energy production with capacity factor (CF) 53.4% and 55% for E-82 and E-53 turbines respectively. The gross and net AEP for turbine E-82 at Assab wind farm was 469.5 GWh and 446.025 GWh respectively with 95% park efficiency. Similarly, the analysis showed that the CF in Dekemhare site was very low with typical value 14.2% and 15.26% for E-82 and E-53 turbines respectively. The gross and net AEP of that site for model turbine E-53 was 53.5 GWh and 50.825 GWh respectively with 5% wake loss. Finally, a simplified economic analysis was carried out to determine the economic feasibility of possible wind power projects in both sites by assuming investment cost 1600 €/kW for E-82 turbine and 2000 €/kW for E-53 turbine. The total wind farm investment cost was found to be 215.85 and 107.93 Million Euro for E-82 and E-53 model turbines respectively. The levelized cost of energy at Assab and Dekemhare wind farm for E-82 model turbine was 0.0307 €/kWh and 0.5526 €/kWh respectively. The analysis result show that the levelized cost of energy in Dekemhare wind fasrm was much higher than that of Assab wind farm.   

Place, publisher, year, edition, pages
2018. , p. 84
Keywords [en]
Wind resource assessment, Wind farm, Annual Energy Aroduction, Assab wind site, Dekemahre wind site, Eritrea, Weibull distribution, Wind rose, Wind power density, Capacity factor.
National Category
Engineering and Technology Other Engineering and Technologies not elsewhere specified
Identifiers
URN: urn:nbn:se:hh:diva-36835OAI: oai:DiVA.org:hh-36835DiVA, id: diva2:1210402
Subject / course
Energy Technology
Educational program
Master's Programme in Renewable Energy Systems, 60 credits
Presentation
2018-05-22, N106, Halmstad University, Halmstad, 11:30 (English)
Supervisors
Examiners
Available from: 2018-05-29 Created: 2018-05-28 Last updated: 2018-05-29Bibliographically approved

Open Access in DiVA

fulltext(4064 kB)38 downloads
File information
File name FULLTEXT02.pdfFile size 4064 kBChecksum SHA-512
1aca509412e9fcb4bbe3695255e89a72993a9d2cf0b58abfa52f5ef85d49246cb4c3afdead3598a389ddd4eaa35af84404fc39eb69614d58de7d150a721a7f68
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Negash, Teklebrhan
By organisation
School of Business, Engineering and Science
Engineering and TechnologyOther Engineering and Technologies not elsewhere specified

Search outside of DiVA

GoogleGoogle Scholar
Total: 38 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 55 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf