hh.sePublications
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Samarbete mellan huvud- och underentreprenörer
Halmstad University.
Halmstad University.
2017 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Cooperation in the Swedish construction industry is largely due to the project in question will be successful or not. We have in this thesis study the critical factors of cooperation between the main and sub-contractor to work throughout the project. We conducted the study through both interviews and a survey to get as wide basis as possible and by that represent the whole industry. We chose to highlight the bits that the various participants consider to be of greatest importance to their work, to work as good as possible. The result of our study shows that the problem of cooperation is perceived differently depending on where in the process the person is sitting. And there is much that can be improved to increase the efficiency of the entire process by improving cooperation. We chose to limit ourselves to see the collaboration from the design stage to start until the building is completed. We have also chosen to limit ourselves to ensure the Swedish construction industry.Cooperation in the Swedish construction industry is largely due to the project in question will be successful or not. We have in this thesis study the critical factors of cooperation between the main and sub-contractor to work throughout the project. We conducted the study through both interviews and a survey to get as wide basis as possible and by that represent the whole industry. We chose to highlight the bits that the various participants consider to be of greatest importance to their work, to work as good as possible. The result of our study shows that the problem of cooperation is perceived differently depending on where in the process the person is sitting. And there is much that can be improved to increase the efficiency of the entire process by improving cooperation. We chose to limit ourselves to see the collaboration from the design stage to start until the building is completed. We have also chosen to limit ourselves to ensure the Swedish construction industry.

Place, publisher, year, edition, pages
2017. , 34 p.
Keyword [sv]
Samarbete, Huvudentreprenör, Underentreprenör
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hh:diva-34187OAI: oai:DiVA.org:hh-34187DiVA: diva2:1110541
External cooperation
Preconal AB
Subject / course
Construction
Supervisors
Available from: 2017-08-24 Created: 2017-06-15 Last updated: 2017-08-24Bibliographically approved

Open Access in DiVA

fulltext(1093 kB)9 downloads
File information
File name FULLTEXT01.pdfFile size 1093 kBChecksum SHA-512
7141e13d15ebac94cd226ad60a36c64d5175f416b3a8fdc97866f6d8bd366d3d3dbef54c5cbcfa1f6370b0f904d173a32ef28f17864b2e12e10f134ba6a508c9
Type fulltextMimetype application/pdf

By organisation
Halmstad University
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 9 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 40 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf