hh.sePublications
System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
The Viability of Installing Mid-Size PV Solar Parks in Sweden: "A paper that evaluates the economic viability of installing mid-size PV solar parks ranging from 250 kW to 2 MW in the village of Åled."
Halmstad University, School of Business, Engineering and Science.
2017 (English)Independent thesis Advanced level (degree of Master (One Year)), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

The ambition of the Swedish government is rapidly concentrating on the development of the

renewable energy systems especially on wind energy, bio energy and solar energy. It has been

observed on the growth of the production of electricity and heat from these three mentioned renewable

energy systems. But, relatively in Sweden the share of production of electricity obtained from PV is

quite smaller than the other two. The PV electricity production in Sweden comprises in a large scale

of mainly the grid connected distributed PV systems and with a small number of installed solar parks.

The aim of this paper is to analyze the viability of installing mid -size PV solar parks in Sweden and

to simulate the effect of the proposed project in the village’s (Åled is the village where the proposed

site is located) and the country’s electricity production. This study includes designing, simulation and

financial analysis of different grid connected centralized mid -size capacities of PV solar parks of 250

kWp,500 kWp,1MWp and 2MWp. They are all fixed ground mounted systems. Moreover, it also

discusses the main reasons that hinders decision makers, the PV complications that are connected to

the grid, Sweden’s energy regulations particularly the emission regulation and the financial policies

of PV. Also, study visit, telephone and email contacts have supplemented it.

This study was done with the collaboration of Nyedal Solenergi, in which the proposed site was

owned by the company and this paper will be a future guide for the investment of the mid-size PV

solar park. According to the study a discussion has been made with the grid supplier (EON) in that

area on the investment on one of the designed projects which are presented in this paper.

The results of the study show that the effect of the proposed systems on the production of electricity

in the village of Åled was between 2.68 – 21.4 % and the impact on the country’s PV electricity

production was 0.2 – 1.58 %. And, the possibility of installing mid-size PV solar parks generally in

Sweden particularly in the proposed site is possible and economically it is viable but not profitable

for system capacities less than 1 MW. As the IRR found for all capacities is greater than the estimated

WACC, hence each proposed capacity has the possibility of paying back all its investment costs in

about 23 years. So, the profitability is very low in case of the 250 kWp and 500 kWp but for the others

they have about 7-8 years of profitability. A sensitivity analysis also has shown the impact of initial

investment costs, O & M costs and electricity export rate on the IRR, NPV and equity payback. The

initial investment cost and electricity export rate were seen with high effect on the IRR, NPV and

equity payback. The LCOE calculated was higher than the average electricity spot price (300

SEK/MWh) for 250 kWp and 500 kWp but lower for the other two capacities. The overall impact for

the financial analysis was due to the decreasing of module prices, the rules that changes every year

on electricity subsidies for renewables, tax reductions and rapid decreasing of electricity spot prices.

In the future if the price of modules continues decreasing, spot price increases, more modification of

the subsidy and introduction of new PV technologies integrated with other sources of energy is done

then such projects could be more profitable.

Place, publisher, year, edition, pages
2017. , p. viii, 48
Keywords [en]
PVsolar park, system design parameters, financial analysis, electricity spot price
National Category
Energy Systems
Identifiers
URN: urn:nbn:se:hh:diva-33931OAI: oai:DiVA.org:hh-33931DiVA, id: diva2:1103787
External cooperation
Nyedal Solenergi
Subject / course
Energy Technology
Supervisors
Examiners
Available from: 2017-06-02 Created: 2017-05-31 Last updated: 2017-07-18Bibliographically approved

Open Access in DiVA

fulltext(5969 kB)1797 downloads
File information
File name FULLTEXT02.pdfFile size 5969 kBChecksum SHA-512
e12fdc9c74e1daed46e82127a148b7dd8fa38cf915665cdfa539f936d03e723698720f395458217a42ffd5e12ac49f0ba1231d3e57fa87d61ea3755c9b6129b8
Type fulltextMimetype application/pdf

By organisation
School of Business, Engineering and Science
Energy Systems

Search outside of DiVA

GoogleGoogle Scholar
Total: 1808 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 552 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf