The Viability of Installing Mid-Size PV Solar Parks in Sweden: "A paper that evaluates the economic viability of installing mid-size PV solar parks ranging from 250 kW to 2 MW in the village of Åled."
Högskolan i Halmstad, Akademin för ekonomi, teknik och naturvetenskap.
2017 (engelsk)Independent thesis Advanced level (degree of Master (One Year)), 10 poäng / 15 hpOppgave
Abstract [en]

The ambition of the Swedish government is rapidly concentrating on the development of the

renewable energy systems especially on wind energy, bio energy and solar energy. It has been

observed on the growth of the production of electricity and heat from these three mentioned renewable

energy systems. But, relatively in Sweden the share of production of electricity obtained from PV is

quite smaller than the other two. The PV electricity production in Sweden comprises in a large scale

of mainly the grid connected distributed PV systems and with a small number of installed solar parks.

The aim of this paper is to analyze the viability of installing mid -size PV solar parks in Sweden and

to simulate the effect of the proposed project in the village’s (Åled is the village where the proposed

site is located) and the country’s electricity production. This study includes designing, simulation and

financial analysis of different grid connected centralized mid -size capacities of PV solar parks of 250

kWp,500 kWp,1MWp and 2MWp. They are all fixed ground mounted systems. Moreover, it also

discusses the main reasons that hinders decision makers, the PV complications that are connected to

the grid, Sweden’s energy regulations particularly the emission regulation and the financial policies

of PV. Also, study visit, telephone and email contacts have supplemented it.

This study was done with the collaboration of Nyedal Solenergi, in which the proposed site was

owned by the company and this paper will be a future guide for the investment of the mid-size PV

solar park. According to the study a discussion has been made with the grid supplier (EON) in that

area on the investment on one of the designed projects which are presented in this paper.

The results of the study show that the effect of the proposed systems on the production of electricity

in the village of Åled was between 2.68 – 21.4 % and the impact on the country’s PV electricity

production was 0.2 – 1.58 %. And, the possibility of installing mid-size PV solar parks generally in

Sweden particularly in the proposed site is possible and economically it is viable but not profitable

for system capacities less than 1 MW. As the IRR found for all capacities is greater than the estimated

WACC, hence each proposed capacity has the possibility of paying back all its investment costs in

about 23 years. So, the profitability is very low in case of the 250 kWp and 500 kWp but for the others

they have about 7-8 years of profitability. A sensitivity analysis also has shown the impact of initial

investment costs, O & M costs and electricity export rate on the IRR, NPV and equity payback. The

initial investment cost and electricity export rate were seen with high effect on the IRR, NPV and

equity payback. The LCOE calculated was higher than the average electricity spot price (300

SEK/MWh) for 250 kWp and 500 kWp but lower for the other two capacities. The overall impact for

the financial analysis was due to the decreasing of module prices, the rules that changes every year

on electricity subsidies for renewables, tax reductions and rapid decreasing of electricity spot prices.

In the future if the price of modules continues decreasing, spot price increases, more modification of

the subsidy and introduction of new PV technologies integrated with other sources of energy is done

then such projects could be more profitable.

sted, utgiver, år, opplag, sider
2017. , s. viii, 48
Emneord [en]
PVsolar park, system design parameters, financial analysis, electricity spot price
HSV kategori
Identifikatorer
URN: urn:nbn:se:hh:diva-33931OAI: oai:DiVA.org:hh-33931DiVA, id: diva2:1103787
Eksternt samarbeid
Nyedal Solenergi
Fag / kurs
Energy Technology
Veileder
Examiner
Tilgjengelig fra: 2017-06-02 Laget: 2017-05-31 Sist oppdatert: 2017-07-18bibliografisk kontrollert

Open Access i DiVA

fulltext(5969 kB)999 nedlastinger
Filinformasjon
Fil FULLTEXT02.pdfFilstørrelse 5969 kBChecksum SHA-512
e12fdc9c74e1daed46e82127a148b7dd8fa38cf915665cdfa539f936d03e723698720f395458217a42ffd5e12ac49f0ba1231d3e57fa87d61ea3755c9b6129b8
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 999 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 285 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf